Established by the current proposal:
- The maximum bond authorization is $41 million.
- The proposal includes additions, renovations/equipment, instructional technology, and site improvements.
- The plan contemplates consolidation of district facilities.
- The plan includes a new 7th–8th grade wing at the high school campus.
- The plan contemplates Northwood serving K–2.
- The plan contemplates North serving grades 3–6.
- The plan contemplates Central serving early childhood and administration.
- The Middle School would no longer operate as a separate school building if the proposed configuration is implemented.
To be developed through planning and design:
- Exact classroom configurations
- Specific room assignments
- Final traffic patterns
- Detailed site design
- Final location of relocated outdoor facilities
- Shared-use schedules
- Administrative structures
- Detailed construction phasing
- Final architectural finishes and furnishings
- Detailed programming within individual spaces
This distinction is important because the bond establishes a framework and financial authorization; it does not eliminate the need for thoughtful planning after the election.